Shipyard Brokerage
Supervision & Survey
BWTS - Ballast Water Treatment System Installation
You can choose any of below working models to fix your vessel BWTS Ballast Water Treatment System
A- Working Model 1
Fabrication & line up to install & fixing BWTS : If you have a 3D scan and drawing of the line of BWTS you can forward us all details. We prefabrica all systems and keep them ready in our workshop & warehouse. We come on board with the system and team upon your vessel arrives at the shipyard or anchorage area. We start assembling & installation of the BWTS on the first day. We complete installation of the system according to the rules, class & manufacturer requirements with high quality and best operation performance. Our targets are to complete the jobs in minimum time loss, using efficient budget, high quality work and customer satisfaction.
B- Working Model 2
Line up and revise fabricated pipes fix and install The BWTS : If you fabricated already the BWTS and its lines and you need only fitter & welder team to use a workshop due to some producing mistake, we can provide team with skill of fitter & welder and can use our workshop and warehouse to take action to re-fabricate or revise the part of which items is wrong and again producing. We can easily tolerate and re -prefabricate them and assemble them to complete the system.
C- Working Model 3
Provide team either with or without equipment for installing BWTS : If you need only fitters & welders to support your team and assist installation BWTS, we can provide team with skill of fitter & welder either with or without gears, tools, and equipment as seafarer to work on board.
Our Advantage
We can install any kind of type of BWTS ( Ballast water treatment systems ) and line up operation on board.
We can fabricate all pipes before vessel arrival and fix them with installing BWTS at shipyard or afloat
in min loss time and
delivering the vessel on time with
cost of efficient budget.
With the entry into force of the IMO Ballast Water Management Convention on 8 September 2017, a substantial number of vessels are required to install a Ballast Water Treatment System (BWTS) by 8 September 2024. This technical news provides some practical recommendations on how to effectively install a system on time.
Click for more information https://www.dnv.com/news/installation-of-bwts-some-practical-recommendations-130594
To find best shipyard option according your work list, budget and time schedule for your vessel.
Following and coordinating repair or new building operation between shipyard - ship - her owners or management on board.
We perform emergency or planned ship repair afloat or in drydock situation with minimum waiting time, and efficient budget usage.
to arrange Workshops & its technical supply to coordinate repair operation, servis and crew changing.